Summary:...
1. The
planetary gearbox should be firmly installed on a stable level base or base, the oil in the oil drain tank should be able to be removed, and the air cooling circulation system should be smooth. Basically unreliable, it will cause vibration and noise during operation, and promote the damage of rolling bearings and transmission gears. When the transmission system connecting parts have prominent objects or the transmission gear, sprocket chain transmission system is selected, the safety device should be modified, and the thickened type should be used when the output shaft bears a large axial load.
2. Install the equipment in accordance with the regulations to ensure that the workers can easily get close to the oil level gauge, the ventilation plug and the oil drain plug. After the installation is in place, the accuracy of the installation part should be checked in all directions in order, the stability of the clamping of each standard part, and it should be able to rotate flexibly after installation. The planetary gear reducer uses the oil pool to splash and lubricate. Before operation, the customer needs to take out the screw plug of the vent and replace the vent plug. Check the height-to-width ratio of the oil baseline according to different installation positions and open the oil volume plug screw, supply oil from the oil volume plug until the grease overflows from the oil volume plug hole, and then close the oil volume plug clearly and accurately. , The full-load trial operation can be carried out, and the time should not be less than 2 hours. The operation should be stable, without impact, vibration, noise, and water and oil leakage. Any abnormality should be cleared immediately. After a certain period of time, the oil quantity should be checked again to avoid possible leakage caused by the casing. If the working temperature is too high or too low, the grease model can be changed.
3. When installing the planetary gear reducer, attach great importance to the centerline alignment of the transmission system management center, and the determination error shall not exceed the application compensation amount of the commonly used coupling. Good alignment can increase the service life and obtain the ideal high efficiency of the transmission system.
4. When installing the transmission equipment on the output shaft, it is not allowed to hit with a hammer. Generally, the installation fixture and shaft end thread are used to press the transmission equipment in with anchor bolts, otherwise the internal parts of the reducer may be damaged. The rigidity mobile coupling is very selected. Therefore, the improper installation of such couplings will cause excess additional load, and even lead to the initial destruction of the rolling bearing, and even the rupture of the output shaft when it is more serious.